• Client – SEPA
  • Package – Hard Landscape
  • Location – Edithvale
  • Sub Contract Value - $ 1,150,000

Overview

As part of the level crossing removals project at Edithvale, Bonbeach and Chelsea train stations, Yarra Contracting successfully delivered the hard landscape package at the Edithvale Train Station on behalf the Southern Program Alliance (SPA).

The design was quite intricate with many different types of concrete pavements and finishes to be installed, which included standard grey council specified path, washed off exposed aggregate, coloured concrete and sandblasted exposed.

The work was delivered successfully alongside live traffic on both Station street and Nepean Hwy.

Scope of Works

  • Subgrade trim
  • Sub grade improvements
  • Crushed rock base prep
  • Concrete pavements
  • Final clean and sealing

Yarra Contracting acknowledges Traditional Owners of the land on which we work and travel throughout Australia. We pay our respect to Aboriginal and Torres Strait Islander cultures; and to Elders past and present. We acknowledge and thank the Bunurong people, the traditional owners of the land on which our office sits here in Victoria and where we meet daily.